Pages

Wednesday, May 31, 2017

HDB 2 room BTO Reno Journey 1 (Window Grilles works) By Yong Heng Andy

Before window grilles

Andy from Yong Heng was at least 40 min earlier than our appt

Fixing outside while waiting for me
HDB 2room BTO living room window grilles


HDB 2room BTO bed room window grilles
Counter top and cabinet swatches

Solid surface top

Marble Quartz Top
I chose this....as he gave me a good price i cant say no

Pick this....like laminated surface. Fell in love with it.

Done on 03 May 2017 , for living and bedroom SGD300. Yong Heng Aluminium Works -Andy. Process took about an hour.

Its good to start the window grilles first before laying the floor tiles. In case the installer drop the grilles but it will become dusty when the flooring is in progress. Anyway it still be dusty with other works like aircon,painting and tiling.

Hmm i really dunno to do it before anything else or the last few process. i think better last few steps. Cos later very hard to clean.

Oh yes i bought the bedroom door from him too. 

No comments:

Post a Comment