Cement and cardboard delivered on same day i picked the tile
I start my flooring on 14 May 2017 Sunday morning. Did a simple prayer.
|
Ah Boon Tiler and Peter in yellow |
|
A few days after work commence |
|
Ah Boon Tiler said my tiles v hard to cut. Have to use hand.Take a longer time |
|
Ask Ah Boon to help me correct the slope at the main entrance so my wealth is not leak out |
I did the shower kerb for the shower screen , these glass contractors dont do kerb. U can also do the kitchen cabinet kerb, i heard it make your cabinet more lasting. I didnt do it. I opt for full flush kitchen cabinet without legs or kerb.
After the floor was done a week later, Peter washed the kitchen and toilet to install kitchen cabinet.
Touchup and complete washing not done yet. He said to lay the cardboards to protect the tiles since i still have many installations or works to be done.
|
No comments: